Healthcare Active Hospital

Healthcare Facility LVT Installation

Phased flooring replacement across patient rooms, corridors, and treatment areas while maintaining 24/7 hospital operations.

Healthcare facility corridor flooring installation

The Challenge

The Regional Medical Center's original flooring had reached the end of its service life after years of continuous use. The vinyl composition tile in corridors showed significant wear paths, while patient room flooring had developed maintenance issues that made infection control increasingly difficult.

The critical constraint: the hospital operates around the clock with no ability to close wings or redirect patients. Any flooring work had to happen around active patient care, with strict infection control protocols and noise limitations.

Our Approach

We developed a phased installation plan that divided the project into manageable sections, each coordinated with hospital administration and nursing staff. Work in patient areas was scheduled during lower-census periods when possible.

Key Strategies

  • Containment protocols: Full dust barriers and negative air pressure in work zones to maintain infection control standards
  • Quiet hours compliance: All noisy work scheduled outside patient rest periods
  • Room-by-room coordination: Daily communication with nursing managers on room availability
  • Rapid cure products: Selected adhesives and finishes that allowed quick return to service

Product Selection

Working with the hospital's infection control team, we recommended a multi-product approach tailored to each area's specific demands:

  • Patient rooms: Homogeneous sheet vinyl with heat-welded seams for seamless, cleanable surfaces
  • Corridors: Commercial-grade rubber flooring rated for heavy rolling loads and stretcher traffic
  • Nurses' stations: LVT with acoustic underlayment for staff comfort during long shifts
  • Treatment areas: Static-dissipative flooring in rooms with sensitive equipment

Results

The project was completed on schedule with strong infection control performance and minimal disruption to patient care. The new flooring improved cleanability and simplified daily maintenance for staff.

Project Details

Industry
Healthcare
Project Scope
Active hospital replacement
Schedule
Phased, around-the-clock coordination
Products Used
Sheet VinylRubber FlooringLVT
Services
InstallationFloor RemovalSubfloor PreparationMoisture Mitigation

Discuss Your Project

Have a Similar Project?

Let's discuss how we can help your healthcare facility achieve the same results.